Real Results, Real Homes
Before & After
See the dramatic transformations we deliver for Georgia homeowners. Every project includes scope, budget, timeline, and the story behind the renovation.
Before
AfterComplete Kitchen Overhaul
Kitchen RemodelingLocation
Marietta, GA
Investment
$42,000
Timeline
6 weeks
The Challenge
The homeowners had a closed-off, dark kitchen with outdated laminate countertops and cabinets from the 1990s. They wanted an open-concept layout for entertaining.
The Result
A bright, modern kitchen with 40% more counter space. The open layout connects the kitchen to the living room. Home value estimated to have increased by $55,000.
Scope of Work
✓ Removed load-bearing wall for open concept
✓ Quartz waterfall island countertop
✓ Custom soft-close shaker cabinets
✓ Under-cabinet LED lighting
✓ New LVP flooring throughout
✓ Recessed lighting and pendant fixtures
Before
AfterADA Accessible Bathroom Conversion
Accessible BathroomsLocation
Atlanta, GA
Investment
$18,500
Timeline
3 weeks
The Challenge
A veteran with mobility issues could no longer use the standard bathtub safely. The narrow bathroom door prevented wheelchair access.
The Result
A fully accessible bathroom with zero-threshold shower entry. The door was widened to 36 inches. The veteran can now bathe independently and safely. Project partially funded through VA SAH grant.
Scope of Work
✓ Tub removed and replaced with barrier-free roll-in shower
✓ ADA-height comfort toilet
✓ Fold-down teak shower bench
✓ Grab bars at all transfer points
✓ Non-slip porcelain tile flooring
✓ Handheld and rain shower heads
Before
AfterLuxury Master Bathroom Renovation
Bathroom RemodelingLocation
Alpharetta, GA
Investment
$35,000
Timeline
5 weeks
The Challenge
The existing master bathroom had a builder-grade tub/shower combo, a single vanity, and vinyl flooring that was peeling due to moisture damage.
The Result
A spa-inspired retreat with separate tub and shower. Heated floors eliminate the cold morning shock. The dual vanity solved the morning routine bottleneck.
Scope of Work
✓ Freestanding soaking tub
✓ Frameless glass walk-in shower
✓ Heated porcelain tile floors
✓ Double vanity with vessel sinks
✓ Custom tile niche and accent wall
✓ New exhaust fan and recessed lighting
Before
AfterComposite Deck & Outdoor Kitchen
Outdoor Living & DecksLocation
Roswell, GA
Investment
$52,000
Timeline
4 weeks
The Challenge
The backyard was an underutilized grass area with no outdoor living space. The homeowners wanted to create an entertainment area for family gatherings.
The Result
A multi-zone outdoor living space that effectively added a new room to the home. The family now hosts dinner parties and gatherings year-round.
Scope of Work
✓ 450 sqft Trex Transcend composite deck
✓ Built-in grill island with granite countertop
✓ Outdoor refrigerator and sink
✓ Cedar pergola with string lights
✓ LED stair and railing lighting
✓ Natural gas fire pit with seating
Before
AfterBasement Entertainment Suite
Basement FinishingLocation
Kennesaw, GA
Investment
$68,000
Timeline
10 weeks
The Challenge
The unfinished basement was being used for storage. With two teenagers, the family needed more living space but did not want the cost and disruption of a home addition.
The Result
A fully finished lower level with distinct zones for entertainment, exercise, and relaxation. The basement finishing was 40% less expensive than a comparable room addition.
Scope of Work
✓ 1,200 sqft finished basement
✓ Home theater with 120" screen
✓ Wet bar with quartz countertop and wine fridge
✓ Full bathroom with tile shower
✓ Gym area with rubber flooring
✓ Dedicated HVAC zone and egress window
Before
AfterFlexStep Platform Lift Installation
FlexStep Platform LiftLocation
Cartersville, GA
Investment
$28,000
Timeline
3 days
The Challenge
A family member in a wheelchair could not access the second floor. A traditional elevator would cost $30,000–$50,000 and require major structural work.
The Result
The FlexStep transforms from a standard staircase to a wheelchair platform lift at the press of a button. Installed in 3 days with no structural modifications. Saved over $20,000 compared to a traditional elevator.
Scope of Work
✓ FlexStep platform lift (dual-purpose stair/lift)
✓ Electrical connection and safety systems
✓ Color-matched to existing decor
✓ Remote control operation
✓ Zero structural modifications required
✓ Full manufacturer warranty
Your Home Could Be Next
Every transformation starts with a free consultation. Tell us your vision and we'll show you what's possible.
