Real Results, Real Homes

Before & After

See the dramatic transformations we deliver for Georgia homeowners. Every project includes scope, budget, timeline, and the story behind the renovation.

Before: Complete Kitchen OverhaulBefore
After: Complete Kitchen OverhaulAfter

Complete Kitchen Overhaul

Kitchen Remodeling

Location

Marietta, GA

Investment

$42,000

Timeline

6 weeks

The Challenge

The homeowners had a closed-off, dark kitchen with outdated laminate countertops and cabinets from the 1990s. They wanted an open-concept layout for entertaining.

The Result

A bright, modern kitchen with 40% more counter space. The open layout connects the kitchen to the living room. Home value estimated to have increased by $55,000.

Scope of Work

Removed load-bearing wall for open concept

Quartz waterfall island countertop

Custom soft-close shaker cabinets

Under-cabinet LED lighting

New LVP flooring throughout

Recessed lighting and pendant fixtures

Learn more about Kitchen Remodeling
Before: ADA Accessible Bathroom ConversionBefore
After: ADA Accessible Bathroom ConversionAfter

ADA Accessible Bathroom Conversion

Accessible Bathrooms

Location

Atlanta, GA

Investment

$18,500

Timeline

3 weeks

The Challenge

A veteran with mobility issues could no longer use the standard bathtub safely. The narrow bathroom door prevented wheelchair access.

The Result

A fully accessible bathroom with zero-threshold shower entry. The door was widened to 36 inches. The veteran can now bathe independently and safely. Project partially funded through VA SAH grant.

Scope of Work

Tub removed and replaced with barrier-free roll-in shower

ADA-height comfort toilet

Fold-down teak shower bench

Grab bars at all transfer points

Non-slip porcelain tile flooring

Handheld and rain shower heads

Learn more about Accessible Bathrooms
Before: Luxury Master Bathroom RenovationBefore
After: Luxury Master Bathroom RenovationAfter

Luxury Master Bathroom Renovation

Bathroom Remodeling

Location

Alpharetta, GA

Investment

$35,000

Timeline

5 weeks

The Challenge

The existing master bathroom had a builder-grade tub/shower combo, a single vanity, and vinyl flooring that was peeling due to moisture damage.

The Result

A spa-inspired retreat with separate tub and shower. Heated floors eliminate the cold morning shock. The dual vanity solved the morning routine bottleneck.

Scope of Work

Freestanding soaking tub

Frameless glass walk-in shower

Heated porcelain tile floors

Double vanity with vessel sinks

Custom tile niche and accent wall

New exhaust fan and recessed lighting

Learn more about Bathroom Remodeling
Before: Composite Deck & Outdoor KitchenBefore
After: Composite Deck & Outdoor KitchenAfter

Composite Deck & Outdoor Kitchen

Outdoor Living & Decks

Location

Roswell, GA

Investment

$52,000

Timeline

4 weeks

The Challenge

The backyard was an underutilized grass area with no outdoor living space. The homeowners wanted to create an entertainment area for family gatherings.

The Result

A multi-zone outdoor living space that effectively added a new room to the home. The family now hosts dinner parties and gatherings year-round.

Scope of Work

450 sqft Trex Transcend composite deck

Built-in grill island with granite countertop

Outdoor refrigerator and sink

Cedar pergola with string lights

LED stair and railing lighting

Natural gas fire pit with seating

Learn more about Outdoor Living & Decks
Before: Basement Entertainment SuiteBefore
After: Basement Entertainment SuiteAfter

Basement Entertainment Suite

Basement Finishing

Location

Kennesaw, GA

Investment

$68,000

Timeline

10 weeks

The Challenge

The unfinished basement was being used for storage. With two teenagers, the family needed more living space but did not want the cost and disruption of a home addition.

The Result

A fully finished lower level with distinct zones for entertainment, exercise, and relaxation. The basement finishing was 40% less expensive than a comparable room addition.

Scope of Work

1,200 sqft finished basement

Home theater with 120" screen

Wet bar with quartz countertop and wine fridge

Full bathroom with tile shower

Gym area with rubber flooring

Dedicated HVAC zone and egress window

Learn more about Basement Finishing
Before: FlexStep Platform Lift InstallationBefore
After: FlexStep Platform Lift InstallationAfter

FlexStep Platform Lift Installation

FlexStep Platform Lift

Location

Cartersville, GA

Investment

$28,000

Timeline

3 days

The Challenge

A family member in a wheelchair could not access the second floor. A traditional elevator would cost $30,000–$50,000 and require major structural work.

The Result

The FlexStep transforms from a standard staircase to a wheelchair platform lift at the press of a button. Installed in 3 days with no structural modifications. Saved over $20,000 compared to a traditional elevator.

Scope of Work

FlexStep platform lift (dual-purpose stair/lift)

Electrical connection and safety systems

Color-matched to existing decor

Remote control operation

Zero structural modifications required

Full manufacturer warranty

Learn more about FlexStep Platform Lift

Your Home Could Be Next

Every transformation starts with a free consultation. Tell us your vision and we'll show you what's possible.